The part you never see is the part that matters

A slab we poured for a steel building. Most of the work happened before any concrete arrived.

  1. Grade beam trenches, vapor barrier and a tied rebar grid on plastic chairs before a slab pour

    Beams, barrier and steel

    Grade beams dug around the edges and across the middle. A vapor barrier to block ground moisture. A rebar grid tied and raised on chairs, so the steel ends up inside the concrete instead of lying under it.

  2. Finished concrete slab with anchor bolts along the edges

    Poured, finished, bolts set

    Poured and finished flat, with anchor bolts placed exactly where the building's columns would land.

  3. Steel building frame standing on the finished concrete slab

    The building goes up

    A steel building frame rising on the finished slab. Everything above it depends on what's underneath.

Planning a shop, garage or metal building?

Book a free visit

Book a free visit

Just your name, number and the project. We'll call within one business day to pick a time. Everything else can wait for the visit.

Call (832) 800-7410

Not sure what it would cost? Text us a photo and we'll reply with a ballpark.

Email sales@jyconstructionhtx.com

Monday to Saturday, 7am to 6pm

Call Text Free visit